Haelvoet blog

Design, news and inspiration

07-05-14 Company news




A good basis is fundamental


Thanks to the favourable weather conditions, the construction of Haelvoet’s new building is making considerable progress.


Because an additional level is created on top of the existing buildings, new foundations are necessary. That’s why the building contractor has drilled pile foundations up to a depth of 17 metres this week. To avoid trembling damage to the existing buildings, we have opted for pillars created in the ground.
The groundwork is still in full swing for now, but the work on the surface will be started as soon as possible. We will keep you posted!

Read more about Haelvoet’s new building:

>> It has begun... (28/03/2014)